Service/Pump Overhaul Workshop
Specialist Engineering Facility

Repair the pump.
Not the whole machine.

Precision workshop strip-down, ultrasonic cleaning, manifold re-machining, and calibrated hydrostatic load testing for industrial triplex plunger pumps up to 350 BAR.

// The Workshop Standard

The 7-Stage Precision Overhaul Protocol

Every pump received at our central facility undergoes an uncompromising multi-stage strip-down and testing procedure before return.

01Phase

Receive & Log

The pump is booked in, assigned a unique workshop job reference, photographed, and logged against its machine and customer record.

02Phase

Diagnostic Inspection

Initial external inspection for manifold hairline cracks, oil emulsification (water in crankcase), and shaft play before teardown.

03Phase

Complete Teardown

Precision disassembly of brass manifold, valves, ceramic plungers, oil seals, packings, connecting rods, and crankshaft.

04Phase

Condition Assessment & Quote

Micrometer measurement of wear surfaces. A formal fixed-price overhaul quote is issued before any replacement parts are fitted.

05Phase

Precision Rebuild

Ultrasonic cleaning of manifold; installation of genuine OEM seals, high-pressure packings, ceramic plungers, and fresh ISO 68 oil.

06Phase

Calibrated Hydro-Test

The rebuilt pump is mounted to our workshop motor test bench and run for 30 minutes at full working pressure and rated flow.

07Phase

Certification & Return

A signed Alkota Workshop Test Certificate is issued with measured pressure, flow, and warranty coverage before dispatch or refitting.

// Brand Capabilities

Supported Industrial Pump Manufacturers

General Pump

Turnaround: 2–4 working days in workshop
Common Models Overhauled:
EZ SeriesT Series (T9051, T9211)TS Series (TS2021, TS1511)CW Series
  • Full crankcase strip-down & bearing replacement
  • Ceramic plunger renewal & micro-alignment
  • Manifold resurfacing & valve pocket re-machining
  • Hydrostatic dynamic pressure testing to 350 BAR

CAT Pumps

Turnaround: 3–5 working days in workshop
Common Models Overhauled:
3CP Series5CP Series35 Series2SF / 4SF Direct Drive
  • High-pressure seal & cup replacement
  • Sleeved cylinder inspection and valve kit rebuild
  • Crankcase re-sealing and connecting rod clearance check
  • Continuous duty run-in test on calibrated test rig

Comet Pumps

Turnaround: 2–4 working days in workshop
Common Models Overhauled:
FW2 SeriesRW SeriesTW SeriesPremium Industrial Plunger
  • Valve kit overhaul and spring replacement
  • V-packing and brass spacer replacement
  • Crankshaft journal polish and oil seal renewal
  • Pressure testing and flow verification

Interpump / Hawk

Turnaround: 2–4 working days in workshop
Common Models Overhauled:
Series 44, 47, 50, 66Hawk NMT, XLT, MXT Series
  • High-temperature seal conversions for hot feed water
  • Solid ceramic plunger replacement
  • Manifold check and valve overhaul
  • Workshop hydro-testing and performance certification

Send-In Workshop Overhaul

Courier or deliver your unmounted pump directly to our central engineering facility. We log the unit, strip and assess, issue a formal fixed-price overhaul quote, rebuild with genuine OEM packings, and test on our calibrated load rig before secure return shipment.

Book Workshop Send-In

On-Site Pump Replacement & Fitting

Need zero downtime? An Alkota mobile field service engineer can attend your site with a pre-configured, tested replacement pump assembly, unbolt the failed unit, mount and align the replacement, and commission the machine under full load.

Book On-Site Engineer