Fleet & Logistics📍 North West, England

4-Bay Centralised Logistics Depot Installation

OPERATIONAL THROUGHPUT: 60 HGVs per 4-hour shift (< 4 mins/vehicle average)
01 // OPERATIONAL CHALLENGE

High-frequency distribution hub requiring 60+ articulated HGVs cleaned daily within a 4-hour evening dispatch window without wash bay frost downtime.

02 // ENGINEERING SCOPE & SOLUTION

Central plant room with dual triplex ceramic pump skids (N+1 redundancy), 360° stainless steel overhead boom arms, automatic underbody rinse, and frost-protected thermal enclosures.

SYSTEM ARCHITECTURE

Centralised Plant Room feeding 4 x Heavy-Duty Wash Bays with 360° Booms

WATER & EFFLUENT STRATEGY

Graded concrete bay drainage with continuous coalescing oil interception and sediment pit settlement.

AUTOMATION & CONTROLS

Semi-automated on-demand pressure delivery with remote operator bay fobs and automatic frost cycle protection.

LIFECYCLE SERVICE AGREEMENT

Tier 02 Planned + Priority Reactive Maintenance with quarterly fluid and seal overhauls.

CLIENT FEEDBACK
"The dual-pump N+1 plant room setup has completely eliminated vehicle wash downtime during our peak evening dispatch."
— Operations Engineering Lead, Major UK Distribution Hub