4-Bay Centralised Logistics Depot Installation
High-frequency distribution hub requiring 60+ articulated HGVs cleaned daily within a 4-hour evening dispatch window without wash bay frost downtime.
Central plant room with dual triplex ceramic pump skids (N+1 redundancy), 360° stainless steel overhead boom arms, automatic underbody rinse, and frost-protected thermal enclosures.
Centralised Plant Room feeding 4 x Heavy-Duty Wash Bays with 360° Booms
Graded concrete bay drainage with continuous coalescing oil interception and sediment pit settlement.
Semi-automated on-demand pressure delivery with remote operator bay fobs and automatic frost cycle protection.
Tier 02 Planned + Priority Reactive Maintenance with quarterly fluid and seal overhauls.
"The dual-pump N+1 plant room setup has completely eliminated vehicle wash downtime during our peak evening dispatch."— Operations Engineering Lead, Major UK Distribution Hub
Have a similar wash requirement?
Connect with our UK engineering team to scope your application.